Infrastructure of Motorway Demir Kapija – Smokvica

The construction of the 28.2 km modern motorway from Demir Kapija up to Smokvica by AKTOR in April 2018

Infrastructure of Motorway Demir Kapija – Smokvica

The construction of the 28.2 km modern motorway from Demir Kapija up to Smokvica by AKTOR in April 2018

Project Information

The construction of the 28.2 km modern motorway from Demir Kapija up to Smokvica by AKTOR in April 2018, signaled in parallel the completion of the European Corridor X that connects Salzburg, Austria with Thessaloniki, Greece via Ljubljana, Zagreb, Belgrade and Skopje (total length of 1,451 km).

The motorway is a dual carriageway with two lanes plus an emergency lane per direction and is a section of the Trans European Transport Network. The construction project also included two twin tunnels of 4.7 km, 6 major bridges, 2 interchanges, 5 overpasses and 7 underpasses, as well as 120 underground culverts.

The estimated circulation of the motorway is approximately 10,000 vehicles/day.

The Motorway Demir Kapija-Smokvica, also called «Friendship Motorway» was a symbolic project, since it marked the start of the European campaign for community support in the sector of transports.