Settlement of the Eshatia Stream – Part 1

Project Information

Project: Settlement of the Eshatia Stream – Part 1 (from the Ilion Square up to the Efpyridon conduit junction)

Administrator of the project: Ministry of Infrastructure and Transport

Site: Attica

Description: The works involve the construction of:

  • a closed rectangular twin culvert of total length 3.3 km
  • new sewage pipelines construction, with total length of 2.1 km
  • construction and operation of a pumping station with nominal flow rate 2,340 m3/hour
  • a new railway bridge construction made of reinforced concrete, with a 23,75 m span
  • a rainwater pipeline with 410 m total length

 Execution time frame: 2012-

Settlement of the Eshatia Stream – Part 1 map
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

You can adjust all of your cookie settings by navigating the tabs on the left hand side.

For more information on using cookies, click here