Construction of infrastructure for the new twin railway line in the section Rododafni – Psathopyrgos marked from 91+500 to 113+000 and the Panagopoula tunnel

Project Information

Description: The project pertains to the construction of the infrastructure for a 21.5 km section of the new high-speed rail line and all related railway and road works, bridges and underpasses. It also includes construction of the 4.5km-long Panagopoula twin tunnel with connecting shafts and a 0.55 km-long access tunnel
Execution time frame: 2013

Construction of infrastructure for the new twin railway line in the section Rododafni – Psathopyrgos marked from 91+500 to 113+000 and the Panagopoula tunnel map